Skip to content
← Builders in Harrow

Renovations · Harrow

Home renovations in Harrow

We renovate homes across Harrow, from 1930s semis that need a full update to period houses in Pinner, Stanmore and Harrow on the Hill where original details are worth keeping.

Area
Harrow
Planning authority
London Borough of Harrow
Room in an Edwardian house mid-renovation, with freshly plastered walls, a protected cast-iron fireplace, a sash window being restored and a stepladder
AI-generated illustration; not a completed Mirion project.

What to know in Harrow

Renovating an interwar Harrow house

Most of Harrow's family houses were built between the wars, so they are now close to a century old. Typical renovations involve opening up the ground floor by removing or widening the wall between the front and back rooms, replacing old wiring and pipework, insulating floors and lofts, and refitting kitchens and bathrooms. Original features such as stained-glass panels, bay windows and tiled porches are often worth repairing rather than replacing, because they define the character of the street.

Older houses and conservation areas

With 30 conservation areas, Harrow has many houses where changes to the outside, such as windows, doors, roofs and front boundaries, can need planning permission because of Article 4 directions. Applications in conservation areas are reviewed with the council's Conservation Officer, so specifying matching materials and details at the outset saves time. Listed buildings need listed building consent for internal alterations too.

Approvals

Internal work rarely needs planning permission, but removing structural walls needs Building Regulations approval and a structural engineer's design, and notifiable electrical work and all gas work must be done by competent, registered installers.

Garden rooms and outbuildings

Many renovations add a garden room. Harrow's guide suggests siting outbuildings in the final quarter of the garden, at least 2 metres from the boundaries, where they can be up to 4 metres high with a dual-pitched roof or 3 metres otherwise; within 2 metres of a boundary, 2.5 metres is recommended.

How we approach renovations

Our process, from survey and design to building and handover, is explained on the main service page.

Go to our main renovations page

Harrow renovations: common questions

Not planning permission, but removing a load-bearing wall needs Building Regulations approval and an engineer's design for the beam. If the work affects a party wall or chimney breast shared with the neighbour, the Party Wall etc. Act 1996 may also apply.

Check first. Many of Harrow's conservation areas have Article 4 directions that can bring window replacements under planning control, and the council expects designs and materials that suit the original house.